Contact Us | Complaints |

Power Station Upgrade and Attemperation Reservoir Project

Please select the links below to download the following fact sheets:
  • Project Info Sheet (14 August 2006)
  • EA Process Newsletter (14 August 2006)

Please select the links below to download the following project documentation:
  • Aquatic Ecology Montioring Program Dec 09 (521KB)
  • CEMP Reservoir Apr 08 (3MB)
  • CEMP Upgrade Jun 09 (4MB)
  • Construction Environment Management Plan (CEMP) 25 July 08 (3MB)
  • Construction Safety Study Jul 09 (284KB)
  • Development Consent 26 Jun 08 (7MB)
  • DSC Approval 12 May08 (375KB)
  • DSC Submission 23 Apr 08 (8.9MB)
  • DSC Submission Letter 27 Aug 07 (539KB)
  • Emergency Response Plan Aug 07 (121KB)
  • Final Hazard Analysis Nov 09 (392KB)
  • Fire Safety Study (3MB)
  • Fire Safety Study July 09 (3MB)
  • Flora Fauna Targeted Final Report 19 Jun 08 (1.4MB)
  • Flora Fauna Targeted Preliminary Report 04 Jun 08 (187KB)
  • Groundwater Monitoring Program Nov 09 (7MB)
  • Habitat Offset Plan 05 Jun 08 (2.8MB)
  • Habitat Offset Plan DECC Comments 11 Jun 08 (195KB)
  • HAZOP Jul 09 (2MB)
  • Heritage Archival Record 6 Jun 08 (4.2MB)
  • Newsletter - Attemperation Reservoir July 2008 (145KB)
  • OEMP Nov 09 (3MB)
  • Rehabilitation Plan Jun 08 (5MB)
  • Reservoir Consequence Category 23 Jan 07 (434KB)
  • Reservoir Design Report 28 Aug (8.7MB)
  • Risk Studies Jun 09 (2MB)
  • Reservoir Hydrology and Dambreak Jan 07 (2.5MB)
  • Thermal Load Strategy Nov 09 (3MB)