Power Station Upgrade and Attemperation Reservoir Project
- Aquatic Ecology Montioring Program Dec 09 (521KB)
- CEMP Reservoir Apr 08 (3MB)
- CEMP Upgrade Jun 09 (4MB)
- Construction Environment Management Plan (CEMP) 25 July 08 (3MB)
- Construction Safety Study Jul 09 (284KB)
- Development Consent 26 Jun 08 (7MB)
- DSC Approval 12 May08 (375KB)
- DSC Submission 23 Apr 08 (8.9MB)
- DSC Submission Letter 27 Aug 07 (539KB)
- Emergency Response Plan Aug 07 (121KB)
- Final Hazard Analysis Nov 09 (392KB)
- Fire Safety Study (3MB)
- Fire Safety Study July 09 (3MB)
- Flora Fauna Targeted Final Report 19 Jun 08 (1.4MB)
- Flora Fauna Targeted Preliminary Report 04 Jun 08 (187KB)
- Groundwater Monitoring Program Nov 09 (7MB)
- Habitat Offset Plan 05 Jun 08 (2.8MB)
- Habitat Offset Plan DECC Comments 11 Jun 08 (195KB)
- HAZOP Jul 09 (2MB)
- Heritage Archival Record 6 Jun 08 (4.2MB)
- Newsletter - Attemperation Reservoir July 2008 (145KB)
- OEMP Nov 09 (3MB)
- Rehabilitation Plan Jun 08 (5MB)
- Reservoir Consequence Category 23 Jan 07 (434KB)
- Reservoir Design Report 28 Aug (8.7MB)
- Risk Studies Jun 09 (2MB)
- Reservoir Hydrology and Dambreak Jan 07 (2.5MB)
- Thermal Load Strategy Nov 09 (3MB)